Texas Instruments TPS40195EVM-001 (1 Box)

4.9 764 ratings
TPS40195EVM-001 main image
Model Number
TPS40195EVM-001
Manufacturer
Texas Instruments
Datasheet
TPS40195EVM-001 PDF
Description
EVAL MODULE FOR TPS40195-001
Preorder

Products need to verify price and stock, please send inquiry or contact sales

Email: sales@lzchips.com


Product Details

Manufacturer
Texas Instruments
Series
-
Packaging
Box
Product Status
Active
Main Purpose
DC/DC, Step Down
Outputs and Type
1, Non-Isolated
Voltage - Output
3.3V
Current - Output
20A
Voltage - Input
8V ~ 20V
Regulator Topology
Buck
Frequency - Switching
300kHz
Board Type
Fully Populated
Supplied Contents
Board(s)
Utilized IC / Part
TPS40195
Base Product Number
TPS40195

You may place an order without registering to our website.

We strongly suggest you sign in before purchasing as you can track your order in real time.

Means of Payment

For your convenience, we accept multiple payment methods in USD, including PayPal, Credit Card, and wire transfer.

RFQ (Request for Quotations)

It is recommended to request for quotations to get the latest prices and inventories about the part.

Our sales will reply to your request by email within 24 hours.

Important Notice

  1. You'll receive an order information email in your inbox. (Please remember to check the spam folder if you didn't hear from us).
  2. Since inventories and prices may fluctuate to some extent, the sales manager is going to reconfirm the order and let you know if there are any updates.

Latest Review

  • Reviewed on

    There are independent logos and anti-counterfeiting labels, which are very guaranteed.

  • Reviewed on

    Fast delivery, good product quality, and good component suppliers.

  • Reviewed on

    It is fully functional and fully supports my circuit design needs.

  • Reviewed on

    It is very cost-effective. It is rare to have such an excellent product in China.

  • Reviewed on

    Good product!

  • Reviewed on

    It can be shipped in batches according to the order, which is suitable for large projects to purchase in installments.

  • Reviewed on

    The outer packaging is well protected, and there is no problem of foot bending due to transportation.

  • Reviewed on

    After testing, all parameters are within the tolerance range and the quality is very reliable.

  • Reviewed on

    The packaging method is reasonable, easy to use, and reduces loss.

  • Reviewed on

    After a small problem occurs, the manufacturer will quickly send a replacement product, which is very responsible.


Company Profile

Longzi Technology (Shenzhen) Co., Ltd. operates as a global distributor of electronic components. Since our inception, we have adhered to a business philosophy centered on delivering the best products, maintaining an excellent reputation, offering top-notch services, all at reasonable prices. Our commitment to professional quality and consistent professionalism has earned us the trust and support of a majority of suppliers and customers, propelling us swiftly through the competitive market.