Panasonic Electronic Components EVM-2NSX80B15 Bulk sales (1 piece or more)

4.9 851 ratings
EVM-2NSX80B15 main image
Model Number
EVM-2NSX80B15
Manufacturer
Panasonic Electronic Components
Datasheet
EVM-2NSX80B15 PDF
Description
TRIMMER 100KOHM 0.15W J LEAD TOP

Out of Stock

Products may be out of stock or no longer in production,Please contact our sales for details.

Email: sales@lzchips.com


Product Details

Manufacturer
Panasonic Electronic Components
Series
EVM
Packaging
Bulk
Product Status
Obsolete
Resistance
100 kOhms
Power (Watts)
0.15W
Tolerance
±25%
Temperature Coefficient
±250ppm/°C
Number of Turns
1
Adjustment Type
Top Adjustment
Resistive Material
Cermet
Mounting Type
Surface Mount
Termination Style
J Lead
Size / Dimension
Rectangular - 0.111" x 0.087" Face (2.81mm x 2.20mm)

You may place an order without registering to our website.

We strongly suggest you sign in before purchasing as you can track your order in real time.

Means of Payment

For your convenience, we accept multiple payment methods in USD, including PayPal, Credit Card, and wire transfer.

RFQ (Request for Quotations)

It is recommended to request for quotations to get the latest prices and inventories about the part.

Our sales will reply to your request by email within 24 hours.

Important Notice

  1. You'll receive an order information email in your inbox. (Please remember to check the spam folder if you didn't hear from us).
  2. Since inventories and prices may fluctuate to some extent, the sales manager is going to reconfirm the order and let you know if there are any updates.

Latest Review

  • Reviewed on

    The welding is flat and there is no oxidation problem on the pins. I am very satisfied.

  • Reviewed on

    The packaging is strict, and all components are packed in anti-static bags.

  • Reviewed on

    Fast delivery, good product quality, and good component suppliers.

  • Reviewed on

    There are detailed specifications and user guides, which are very considerate.

  • Reviewed on

    It is fully functional and fully supports my circuit design needs.

  • Reviewed on

    After a small problem occurs, the manufacturer will quickly send a replacement product, which is very responsible.

  • Reviewed on

    The seller is very professional and knows the component parameters well. The recommended replacement components are very useful.

  • Reviewed on

    It is very cost-effective. It is rare to have such an excellent product in China.

  • Reviewed on

    The communication with the seller is smooth, and the replenishment needs are also responded quickly.

  • Reviewed on

    After testing, all parameters are within the tolerance range and the quality is very reliable.


Company Profile

Longzi Technology (Shenzhen) Co., Ltd. operates as a global distributor of electronic components. Since our inception, we have adhered to a business philosophy centered on delivering the best products, maintaining an excellent reputation, offering top-notch services, all at reasonable prices. Our commitment to professional quality and consistent professionalism has earned us the trust and support of a majority of suppliers and customers, propelling us swiftly through the competitive market.